PROGRESSION
15851
page-template,page-template-full_width,page-template-full_width-php,page,page-id-15851,bridge-core-3.1.5,qode-page-transition-enabled,ajax_fade,page_not_loaded,,vertical_menu_enabled,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-smooth-scroll-enabled,qode-child-theme-ver-1.0.0,qode-theme-ver-30.8.3,qode-theme-bridge,qode_header_in_grid,qode-wpml-enabled,wpb-js-composer js-comp-ver-7.9,vc_responsive
 

PROGRESSION

No_01-compressor

1. Sample progression

  Work instruction, pattern, materials list

  QC progression
– Use alternative materials in case of not stocking fabric and development of materials

  For evaluation and photo taking

  Confirmation of fabric company and deadline of delivery
– Shipping mark, packing method, stocking document

  Confirmation of deadline of delivery of main order

  Order list registration

  Factory allocation, Schedule brand notification

  Notification of brand of scheduled date of shipping

 

No_02-compressor

2. Preparation for production

  Main QC CFM

  Work instruction, grading, mini marker

  Material CFM, Placing an Order

  Deadline of delivery of fabric, Confirmation of quantity

  Confirmation of order quantity

  Grading pattern, marker check

  Agreement on final estimate

  Confirmation of deadline of delivery, contract

  Fabric test– Confirmation of placing an order for label

  Factory sample progression

 

 

No_03-compressor

3. Shipping plan

  Confirmation of shipping date and brand notification

  Notification of shipping date

  Confirmation of stocking raw material and subsidiary material (domestic, China)

  Notification of brand of stocked quantity of fabric

  Confirmation of labels

  Factory putting land (5 parts)

  Method to complete labels and tags

  Shipping documents (packing, weight, necessary quantity)

  Factory contract

  Shipping (Incheon)

No_04-compressor

4. Shipping progression

  Shipping documents-packing, weight, necessary quantity

  Materials card (7 parts)

  Factory sample(Confirmation of design and the method of sewing)

  Inspection (C/T confirmation)

  Dispatch (dispatch details factory notification)

  Confirmation of China direct delivery material, and labels

 

 

 

 

 

 

No_05-compressor

5. Factory inspection

  Factory inspection C/T confirmation

  Factory allocation confirmation

  Confirmation of production factory materials inspection

  Notification of result of measures for insufficient materials, placing an order

  Notification of brand on the scheduled date of factory putting

 

 

 

 

 

 

No_06-compressor

6. Production progression

  Confirmation of different color and contraction before cutting cloth – When problems occur notify the brand

  Confirmation of number of production lines

  Notification of brand on the scheduled date of release

  Notification of cutting cloth, brand of quantity of cutting cloth

  Confirmation of supply of insufficient materials

  Sewing, completion, inspection

  Storage sample release – Confirmation of color, size

 

 

 

 

No_07-compressor

7. Release plan

  Notification of quantity, brand schedule to be released from factory

  Confirmation of vehicle allocation, stocking

  Completion factory completion inspection – Confirmation of stocked quantity, inspection, packing method

  Notification of brand on the scheduled date of shipping

 

 

 

 

 

 

 

No_08-compressor

8. Delivery

  Notification of brand on the date of shipping

  Confirmation of shipping documents-packing, certificate of origin

  Notification of brand on the scheduled date of delivery

  Notification of packing list distribution

  Distribution stocking

 

 

 

 

 

 

 

No_09-compressor

9. Calculation

  Schedule of deadline of delivery    after shipping

  Calculation after close of delivery

  Issue of tax invoice